Huge M25 service station approved in Buckinghamshire despite objections

Plans for a huge motorway service area with almost 1,000 car parking spaces near Iver Heath have been approved despite warnings about its impact on residents and the environment.

Buckinghamshire Council’s Strategic Sites Committee backed the Colne Valley Services development on land beside the M25 between junctions 15 and 16 after almost four hours of consideration.

Councillors also approved a linked application to extract approximately 173,000 tonnes of sand and gravel from beneath the site to facilitate its construction.

Both applications were approved by nine votes to none, with Cllr David Moore abstaining on each. The outline plans include a facilities building containing food outlets, shops, toilets and rest areas, alongside a drive-through coffee shop and filling stations with 25 fuelling points.

What the new services off the M25 could look like Image: Bucks Council planningplaceholder image
What the new services off the M25 could look like Image: Bucks Council planning

The development would provide up to 991 car parking spaces, including 100 electric-vehicle charging spaces and 50 staff spaces. There would also be 150 HGV spaces, 30 coach spaces, 30 caravan spaces and parking for motorcycles and abnormal loads.

Access would be provided directly from the M25 through new slip roads and an overbridge, while the A4007 Slough Road would be realigned. A controlled access from Slough Road would be available for emergency vehicles, while staff would use a drop-off point outside the service area.

The approximately 45.85-hectare site lies within the Metropolitan Green Belt, Colne Valley Regional Park and two biodiversity opportunity areas.

It is also crossed by the River Alderbourne, which is identified as a priority chalk-stream habitat. The committee previously resolved to approve the plans in September 2023, but final permission was not issued because outstanding legal and Green Belt processes had not been completed.

The application returned following the passage of time and changes to national planning policy.

The Secretary of State confirmed in October 2024 that the application would not be called in and could be determined by the council. Planning officers concluded that the site now qualified as grey belt under the revised National Planning Policy Framework and that the development would meet an unmet need for motorway facilities.

Graham Mansfield, the council’s principal planning officer, told the committee: “Due to the passage of time, there have been a number of material planning considerations that have changed, namely the national planning policy.”

Officers concluded that the need for a motorway service area, its public-safety function, employment opportunities, biodiversity improvements, HGV parking and rights-of-way enhancements outweighed the harm.

A statement submitted by Beaconsfield MP Joy Morrissey said: “The continued loss of Green Belt land in the Ivers is unacceptable and contrary to both local and national planning policy.

“I therefore strongly object to this proposal for a motorway service area.

“This application raises serious concerns for the environment, for sound planning and for the long-term wellbeing of our communities.”

She described the land as a “vital green lung” between the M25 and M4 and warned: “Piece by piece, our Green Belt is being eroded, and we are approaching a point where the character and environmental value of the Ivers will be permanently changed.”

Cllr Wendy Matthews, member for Iver, warned that the 24-hour facility would expose residents to constant traffic noise.

She said: “The constant noise from the movement of cars, motorbikes and HGVs will be heard across Iver Heath, especially at night.

“The HGV park is located closest to the residents of Bangors Road and on the highest point of the site.”

Cllr Matthews said refrigerated trailers could require their engines to run continuously during drivers’ rest breaks and urged the committee to refuse permission.

Katy Barton, representing Iver Environment Centre, warned that air and noise pollution could force the closure of the charitable project. She said: “Iver Environment Centre has worked with well over a quarter of a million people since opening almost 36 years ago.

“We provide access to nature within the Colne Valley Regional Park alongside specialist science education for schools, families and the community, especially people with additional needs.

“The impact on our 8,000 visitors a year has not been adequately considered in the report pack.”

During the meeting, councillors asked committee chairman, Cllr Alex Collingwood, to write to the applicant, Iver Environment Centre and the highways authority encouraging them to work together on measures to mitigate the development’s effects on the centre.

A statement from Colne Valley Regional Park warned that the development would sever an important corridor for people and wildlife between Iver Heath, Black Park and Uxbridge.

However, Tom Jeremiah, speaking for the applicant, said nowhere else in the UK had a greater need for new motorway services.

He said: “The CVS [Colne Valley Services] proposal is demonstrably the best MSA scheme before you today because no other location can better meet the need and bridge more MSA gaps.

“Our scheme would deliver over 35 acres of new woodland planting, providing new footpath links and resulting in 86 per cent biodiversity net gain for habitats.

“The scheme is well hidden, dropped down alongside the motorway and enveloped in a huge belt of new woodland planting.”

The separate minerals application was required because mineral extraction could not legally be included within an outline planning application.

Planning lead officer David Periam said the extraction was intended solely to facilitate the service area and would probably proceed only if the wider development went ahead.

The updated officer’s report says approximately 173,000 tonnes of sand and gravel would be removed, with around 17,300 tonnes reused during construction.

Once the new slip roads were available, extracted material would be transported directly onto the M25 rather than along local roads.

Cllr Llew Monger proposed accepting the officers’ recommendations after telling the committee that the technical complexity meant members needed to place considerable weight on professional planning and legal advice.

Cllr Mark Turner said there was a “very strong strategic need” for the service area.

Cllr Moore said he abstained because he remained concerned that mitigation for the River Alderbourne chalk stream was insufficient.

The committee also requested information encouraging the applicant to consider “exemplary” sustainability measures, including renewable-energy generation, water efficiency and management, carbon neutrality and environmental sustainability.

The committee resolved to delegate approval of both applications to the council’s director of planning and environment, subject to legal agreements and planning conditions.

If those requirements cannot be completed, officers have authority to refuse the applications.

News you can trust since 1832
Follow us
© 2026 Iconic Media Group Ltd. All rights reserved.Cookie SettingsTerms and ConditionsPrivacy notice